Consumables and accessories

Upgrade Kit 12-15/16 long leads IEC

Diagnostic ECG Patient Cables and Leads

Product number:

989803151781

Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.

*
*
*
*
*
*
*
*
*
*
*
*
*

* Required fields

Specifications Show all

Product details
Use with Philips Healthcare Equipment
860315, 860310
Use with Non-Philips Healthcare Equipment
No
Product Category
ECG
Product Type
Diagnostic ECG Patient Cables and Leads
Single-Patient Use OR Multi-Patient Use
Multi-Patient Use
CE Certified
Yes
Not manufactured with natural rubber latex
Yes
Packaging Unit
1
Minimum Shelf Life
None
Sterile OR Non-Sterile
Non-Sterile
Use with Other Supplies
N/A
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
Child; Adult
Application Site
Limb; Chest
Lead Set Length
?
Shielded
Shielded
Number of Leads
16
Electrode Attachment Method
Alligator Clip
Color Coding
IEC