Consumables and accessories

Upgrade Kit 12-15/16 Long Leads AAMI

Diagnostic ECG Patient Cables and Leads

Product number:

989803151771

Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.

Contact information

* This field is mandatory

Contact details

*
*
*

Company details

*
*
*
*
*
*
*

Business details

By specifying your reason for contact we will be able to provide you with a better service.
*
*

Technical Specifications Show more

Product details
Product Category
ECG
Use with Non-Philips Healthcare Equipment
No
Use with Philips Healthcare Equipment
860315, 860310
Product Type
Diagnostic ECG Patient Cables and Leads
Single-Patient Use OR Multi-Patient Use
Multi-Patient Use
CE Certified
No
Packaging Unit
1
Not manufactured with natural rubber latex
Yes
Minimum Shelf Life
None
Sterile OR Non-Sterile
Non-Sterile
Use with Other Supplies
N/A
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
Child; Adult
Application Site
Limb; Chest
Lead Set Length
?
Number of Leads
16
Shielded
Shielded
Electrode Attachment Method
Alligator Clip
Color Coding
AAMI