Search terms
Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.
Request contact
By clicking on the link, you will be leaving the official Royal Philips Healthcare ("Philips") website. Any links to third-party websites that may appear on this site are provided only for your convenience and in no way represent any affiliation or endorsement of the information provided on those linked websites. Philips makes no representations or warranties of any kind with regard to any third-party websites or the information contained therein.
I understandProduct Category |
|
---|---|
Use with Non-Philips Healthcare Equipment |
|
Use with Philips Healthcare Equipment |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Not manufactured with natural rubber latex |
|
Packaging Unit |
|
Sterile OR Non-Sterile |
|
Minimum Shelf Life |
|
Use with Other Supplies |
|
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
Product Category |
|
---|---|
Use with Non-Philips Healthcare Equipment |
|
Use with Philips Healthcare Equipment |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Not manufactured with natural rubber latex |
|
Packaging Unit |
|
Sterile OR Non-Sterile |
|
Minimum Shelf Life |
|
Use with Other Supplies |
|
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
View product
View product
By clicking on the link, you will be leaving the official Royal Philips Healthcare ("Philips") website. Any links to third-party websites that may appear on this site are provided only for your convenience and in no way represent any affiliation or endorsement of the information provided on those linked websites. Philips makes no representations or warranties of any kind with regard to any third-party websites or the information contained therein.
I understand