Search terms
Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
Request contact
By clicking on the link, you will be leaving the official Royal Philips Healthcare ("Philips") website. Any links to third-party websites that may appear on this site are provided only for your convenience and in no way represent any affiliation or endorsement of the information provided on those linked websites. Philips makes no representations or warranties of any kind with regard to any third-party websites or the information contained therein.
I understandUse with Non-Philips Healthcare Equipment |
|
---|---|
Product Category |
|
Use with Philips Healthcare Equipment |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Not manufactured with natural rubber latex |
|
Packaging Unit |
|
Sterile OR Non-Sterile |
|
Minimum Shelf Life |
|
Use with Other Supplies |
|
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
Use with Non-Philips Healthcare Equipment |
|
---|---|
Product Category |
|
Use with Philips Healthcare Equipment |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Not manufactured with natural rubber latex |
|
Packaging Unit |
|
Sterile OR Non-Sterile |
|
Minimum Shelf Life |
|
Use with Other Supplies |
|
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
View product
View product
By clicking on the link, you will be leaving the official Royal Philips Healthcare ("Philips") website. Any links to third-party websites that may appear on this site are provided only for your convenience and in no way represent any affiliation or endorsement of the information provided on those linked websites. Philips makes no representations or warranties of any kind with regard to any third-party websites or the information contained therein.
I understand